Projects

Sample of major projects

Davon Edgecombe acted as lead structural design engineer, engineer of record and project manager for all projects listed on this website. While not all projects were completed under lignin structural; all structural engineering pricing, planning, and execution was completed directly by him or under his guidance and training. No copyright infringement or misinformation is intended by the use of project photos and descriptions.

Albany Development Luxury Home Designs

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 3 to 12 months (Design & Coordination)
– 24 to 48 months (Construction Administration)

FEATURES:

– 2 to 4 Storey
– Pools and Cabanas
– Long Cantilevers
– Budget: 15M to 30M

 

– 19, 000+SF
– Hand frame and Truss systerns
– Flat Plate Concrete Slabs/ Concrete Shear walls / PT Slab

 

– Portal Steel Frame
– Composite Metal Decking
– Moment connections

Aqualina Condos

Cable Beach

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 8 months (Design & Coordination)
– Ongoing (Construction Administration)

FEATURES:

– 12 storey
– Pools and Cabanas
– Grand Lobby

 

– Budget: 75M
– 180,000+ SF

 

– Piles/Caps foundation
– Concrete Shear walls / PT Slabs

Baha Mar Water Park Structures

Baha Mar Blvd

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 8 months (Design & Coordination)
– Construction Completed

FEATURES:

– 85ft Tall Steel Frame Ride Towers
– Pools and Cabanas
– Below grade mechanical rooms with bridge and water feature above

 

– Buildings and Site Structures
 – Budget: 1.5B
– 250,000+ SF

 

– Piles/Caps foundation
– Concrete Shear walls

Bahamas Food Services / Sysco Expansion

Gladstone Road

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 5 months (Design & Coordination)
– 8 to 12 months (Construction Administration)

FEATURES:

– 2 storey
– Dry and Frozen Storage Facility
– Budget: 8M

 

– 140,000+ SF
– Isolated Pad Footings and Slab on Grade

 

– Concrete Tilt-Up Walls

Capital Union Bank

Lyford Cay Road

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 6 months (Design & Coordination)
– 12 months (Construction Administration)

FEATURES:

– 2 storey
– 500 to 1,500 PSF storage on suspended slab

– Storage Racks

– Budget: 10M

– 15,000+ SF

 

– Spread Footings
– Flate Plate Concrete Slabs

Caves Corporate Center

Blake Road

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 2 months (Design & Coordination)
– Construction Completed

FEATURES:

– 3 storey
– Budget: Undisclosed
– 35,000+ SF

 

– Spread Footings

 

– Concrete Shear walls

Children’s Bay Cay

Exuma

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 7 months (Design & Coordination)
– On-Hold (Construction Administration)

FEATURES:

–  2 storey
– Pools and Cabanas

 

– Custom vaulted ceiling steel frame roof
– Budget: 180M
– 600,000+ SF

 

– Piles/Caps foundation
– Concrete Shear wall

FTX Headquarters

Orange Hill

TEAM LEADER ROLE:
Initial Structural Design Consultation

DURATION:

– Ongoing by others (Design & Coordination)
– Pending by others (Construction Administration)

FEATURES:

– 8 storey
– Grand Lobby
– Budget: 60M

 

– 500,000+ SF
– Piles/Caps foundation

 

– Concrete Shear walls / PT Slabs / Steel Frames

FX Pro Bank

Lyford Cay Road

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 9 months (Design & Coordination)
– Ongoing (Construction Administration)

FEATURES:

– 4 storey
– Basement

 

– Roof Trusses – Budget: 30M
– 45,000+ SF

 

– Raft Foundation
– Concrete Shear walls

Goldwynn Hotel

West Bay Street

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

 

DESIGN ARCHITECT:
Makow Associates Architects, Inc.

DURATION:
– 12 months (Design & Coordination)
– Construction Ongoing

FEATURES:

– 7 storey
– Pools and Cabanas
– Grand Lobby

 

– Cable Beach – Budget: 120M
– 180,000+ SF

 

– Piles/Caps foundation
– Concrete Shear walls / PT Slabs

Hurricane Hole

Paradise Island

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 24 months (Design & Coordination)
– Construction Completed

FEATURES:

– 6 multi-storey buildings
– 1, 3 and 7 storey buildings
– Coastal Marina

 

– Cisterns and other site structures
– Shallow footing
– Wood Trusses/Rafters

 

– 250M+ Budget
– Island Development
– Shallow and Deep Foundations
– Flat Plate Concrete Slab

King’s School

Western Road

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 8 months (Design & Coordination)
– Construction Ongoing

FEATURES:

– 3 storey
– Pools and Modern Pool Pump House

 

– Steel Frame Pavilions
– Budget: 25M
– 50,000+ SF

 

– Spread and Isolated Pad Footing
– Masonry Block & Tie Columns

Lyford Cay Development Luxury Home Designs

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 1 to 6 months (Design & Coordination)
– 12 to 18 months (Construction Administration)

FEATURES:

–  1 to 2 Storey
– Pools and Cabanas

 

– 8,000+ SF
– Hand frame and Truss roof systems

 

– Flat Plate Concrete Slabs / Steel Frame / Concrete Shear walls / PT Slabs

Montage Cay

Abaco

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 12 months (Design & Coordination)

FEATURES:

– 2 to 3 storey
– Pools and Cabanas
– Custom vaulted ceiling roof
– Budget: Undisclosed

 

– 700,000+ SF
– Piles/Caps foundation
– Concrete Shear wall

 

– Masonry Structures
– Wood Frame Structures

Old Fort Bay Development Luxury Home Designs

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 1 to 6 months (Design & Coordination)
– 12 to 18 months (Construction Administration)

FEATURES:

– 2 to 4 Storey
– Pools and Cabanas
– Budget: 15M to 30M

 

– 10,000+ SF
– Hand frame and Truss roof systems

 

– Flat Plate Concrete Slabs
– Concrete Shear walls / PT Slabs

Old Fort Bay Office Building

Lyford Cay Road

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 12 months (Design & Coordination)

FEATURES:

– 2 storey
– Steel Frame Roof with Dormers

 

– Roof attic
– Budget: 15M
– 20,000+ SF

 

– Spread Footings
– Masonry Block & Tie Columns

One Cable Beach

Cable Beach

Cable Beach

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 9 months (Design & Coordination)
– Construction Completed

FEATURES:

– 7 storey
– Long Cantilevers
– Slurry Wall

 

– Retaining Wall
– Grand Lobby
– 70M+ Budget

 

– 240,000 SF
– Piles/Cap foundation
– Shear walls / PT Slabs
– Luxury Pool

RIU Hotel

Paradise Island

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 1 month (Design & Coordination)
– 1 month (Construction Administration)

FEATURES:

– 7 storey

 

– Budget: 100K

 

– PT Slabs

Thirty-Six

Paradise Island

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 6 months (Design & Coordination)
– 12 months Construction Completed

FEATURES:

– 5 storey
– Pools and Cabanas
– Wooden Trellises

 

 – Long Cantilevers
– Retaining Walls
– Cisterns
– 50M+ Budget 

 

– 130,000 SF
– Non- Sway Columns
– PT Slabs/Shear Walls

Villa Lyla

Old Fort Bay

TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record

DURATION:
– 4 months ( design and coordination)
– 18 months ( construction administration)

FEATURES:

– 2 storey
– Modern
– High End Luxury

 

– Pools and Cabanas
– Budget: 35M

– 28,000+ SF

 

– Spread and Isolated Pad Footings.
– Concrete Shear walls