Projects
Sample of major projects
Davon Edgecombe acted as lead structural design engineer, engineer of record and project manager for all projects listed on this website. While not all projects were completed under lignin structural; all structural engineering pricing, planning, and execution was completed directly by him or under his guidance and training. No copyright infringement or misinformation is intended by the use of project photos and descriptions.
Albany Development Luxury Home Designs
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 3 to 12 months (Design & Coordination)
– 24 to 48 months (Construction Administration)
FEATURES:
– 2 to 4 Storey
– Pools and Cabanas
– Long Cantilevers
– Budget: 15M to 30M
– 19, 000+SF
– Hand frame and Truss systerns
– Flat Plate Concrete Slabs/ Concrete Shear walls / PT Slab
– Portal Steel Frame
– Composite Metal Decking
– Moment connections
Aqualina Condos
Cable Beach
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
– 8 months (Design & Coordination)
– Ongoing (Construction Administration)
FEATURES:
– 12 storey
– Pools and Cabanas
– Grand Lobby
– Budget: 75M
– 180,000+ SF
– Piles/Caps foundation
– Concrete Shear walls / PT Slabs
Baha Mar Water Park Structures
Baha Mar Blvd
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 8 months (Design & Coordination)
– Construction Completed
FEATURES:
– 85ft Tall Steel Frame Ride Towers
– Pools and Cabanas
– Below grade mechanical rooms with bridge and water feature above
– Buildings and Site Structures
– Budget: 1.5B
– 250,000+ SF
– Piles/Caps foundation
– Concrete Shear walls
Bahamas Food Services / Sysco Expansion
Gladstone Road
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 5 months (Design & Coordination)
– 8 to 12 months (Construction Administration)
FEATURES:
– 2 storey
– Dry and Frozen Storage Facility
– Budget: 8M
– 140,000+ SF
– Isolated Pad Footings and Slab on Grade
– Concrete Tilt-Up Walls
Capital Union Bank
Lyford Cay Road
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 6 months (Design & Coordination)
– 12 months (Construction Administration)
FEATURES:
– 2 storey
– 500 to 1,500 PSF storage on suspended slab
– Storage Racks
– Budget: 10M
– 15,000+ SF
– Spread Footings
– Flate Plate Concrete Slabs
Caves Corporate Center
Blake Road
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 2 months (Design & Coordination)
– Construction Completed
FEATURES:
– 3 storey
– Budget: Undisclosed
– 35,000+ SF
– Spread Footings
– Concrete Shear walls
Children’s Bay Cay
Exuma
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 7 months (Design & Coordination)
– On-Hold (Construction Administration)
FEATURES:
– 2 storey
– Pools and Cabanas
– Custom vaulted ceiling steel frame roof
– Budget: 180M
– 600,000+ SF
– Piles/Caps foundation
– Concrete Shear wall
FTX Headquarters
Orange Hill
TEAM LEADER ROLE:
Initial Structural Design Consultation
DURATION:
– Ongoing by others (Design & Coordination)
– Pending by others (Construction Administration)
FEATURES:
– 8 storey
– Grand Lobby
– Budget: 60M
– 500,000+ SF
– Piles/Caps foundation
– Concrete Shear walls / PT Slabs / Steel Frames
FX Pro Bank
Lyford Cay Road
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 9 months (Design & Coordination)
– Ongoing (Construction Administration)
FEATURES:
– 4 storey
– Basement
– Roof Trusses – Budget: 30M
– 45,000+ SF
– Raft Foundation
– Concrete Shear walls
Goldwynn Hotel
West Bay Street
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DESIGN ARCHITECT:
Makow Associates Architects, Inc.
DURATION:
– 12 months (Design & Coordination)
– Construction Ongoing
FEATURES:
– 7 storey
– Pools and Cabanas
– Grand Lobby
– Cable Beach – Budget: 120M
– 180,000+ SF
– Piles/Caps foundation
– Concrete Shear walls / PT Slabs
Hurricane Hole
Paradise Island
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 24 months (Design & Coordination)
– Construction Completed
FEATURES:
– 6 multi-storey buildings
– 1, 3 and 7 storey buildings
– Coastal Marina
– Cisterns and other site structures
– Shallow footing
– Wood Trusses/Rafters
– 250M+ Budget
– Island Development
– Shallow and Deep Foundations
– Flat Plate Concrete Slab
King’s School
Western Road
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 8 months (Design & Coordination)
– Construction Ongoing
FEATURES:
– 3 storey
– Pools and Modern Pool Pump House
– Steel Frame Pavilions
– Budget: 25M
– 50,000+ SF
– Spread and Isolated Pad Footing
– Masonry Block & Tie Columns
Lyford Cay Development Luxury Home Designs
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 1 to 6 months (Design & Coordination)
– 12 to 18 months (Construction Administration)
FEATURES:
– 1 to 2 Storey
– Pools and Cabanas
– 8,000+ SF
– Hand frame and Truss roof systems
– Flat Plate Concrete Slabs / Steel Frame / Concrete Shear walls / PT Slabs
Montage Cay
Abaco
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 12 months (Design & Coordination)
FEATURES:
– 2 to 3 storey
– Pools and Cabanas
– Custom vaulted ceiling roof
– Budget: Undisclosed
– 700,000+ SF
– Piles/Caps foundation
– Concrete Shear wall
– Masonry Structures
– Wood Frame Structures
Old Fort Bay Development Luxury Home Designs
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 1 to 6 months (Design & Coordination)
– 12 to 18 months (Construction Administration)
FEATURES:
– 2 to 4 Storey
– Pools and Cabanas
– Budget: 15M to 30M
– 10,000+ SF
– Hand frame and Truss roof systems
– Flat Plate Concrete Slabs
– Concrete Shear walls / PT Slabs
Old Fort Bay Office Building
Lyford Cay Road
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 12 months (Design & Coordination)
FEATURES:
– 2 storey
– Steel Frame Roof with Dormers
– Roof attic
– Budget: 15M
– 20,000+ SF
– Spread Footings
– Masonry Block & Tie Columns
One Cable Beach
Cable Beach
Cable Beach
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 9 months (Design & Coordination)
– Construction Completed
FEATURES:
– 7 storey
– Long Cantilevers
– Slurry Wall
– Retaining Wall
– Grand Lobby
– 70M+ Budget
– 240,000 SF
– Piles/Cap foundation
– Shear walls / PT Slabs
– Luxury Pool
RIU Hotel
Paradise Island
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 1 month (Design & Coordination)
– 1 month (Construction Administration)
FEATURES:
– 7 storey
– Budget: 100K
– PT Slabs
Thirty-Six
Paradise Island
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 6 months (Design & Coordination)
– 12 months Construction Completed
FEATURES:
– 5 storey
– Pools and Cabanas
– Wooden Trellises
– Long Cantilevers
– Retaining Walls
– Cisterns
– 50M+ Budget
– 130,000 SF
– Non- Sway Columns
– PT Slabs/Shear Walls
Villa Lyla
Old Fort Bay
TEAM LEADER ROLE:
Structural Design Engineer and Engineer Of Record
DURATION:
– 4 months ( design and coordination)
– 18 months ( construction administration)
FEATURES:
– 2 storey
– Modern
– High End Luxury
– Pools and Cabanas
– Budget: 35M
– 28,000+ SF
– Spread and Isolated Pad Footings.
– Concrete Shear walls